|
Epoxy floor in our Mississauga garage plus full basement concrete assessment: moisture testing results
|
|
0
|
1
|
April 26, 2026
|
|
Added skylights to our Toronto Victorian kitchen: tubular and conventional, what worked better
|
|
0
|
5
|
April 26, 2026
|
|
Replaced eavestroughs on our 1987 Oakville home: 4-inch to 5-inch and leaf guard decision
|
|
0
|
2
|
April 26, 2026
|
|
Re-tiled our entire main bathroom in Richmond Hill: Schluter system, large format tile, and full cost
|
|
0
|
0
|
April 26, 2026
|
|
Built a mudroom addition off our side entry in Burlington: permit, build, and design lessons
|
|
0
|
2
|
April 26, 2026
|
|
200-amp panel upgrade in our Vaughan home plus Level 2 EV charger: full ESA process
|
|
0
|
2
|
April 26, 2026
|
|
EIFS stucco rot on our 1997 Mississauga home: how bad it was and what the repair cost
|
|
0
|
1
|
April 26, 2026
|
|
Gas fireplace gave out after 22 years: repair vs replace decision and what we chose
|
|
0
|
0
|
April 26, 2026
|
|
Legalizing our basement apartment in Scarborough: fire separation, egress windows, permit timeline
|
|
0
|
2
|
April 26, 2026
|
|
Retaining wall replacement in our Scarborough backyard: engineered design, TRCA, and final cost
|
|
0
|
2
|
April 26, 2026
|
|
Spray foamed our rim joists and cathedral ceiling in Thornhill: R-values, costs, and thermal barrier requirement
|
|
0
|
2
|
April 26, 2026
|
|
Built a permit-pulled deck in Etobicoke: inspection process, footing depth, and what failed first time
|
|
0
|
3
|
April 26, 2026
|
|
Full asphalt driveway replacement in Brampton: base preparation lesson and final cost
|
|
0
|
1
|
April 26, 2026
|
|
Converted our double-car garage in North York to a legal secondary suite: full permit process and costs
|
|
0
|
2
|
April 26, 2026
|
|
Egress window wells in our East York basement: city permit experience and waterproofing lessons
|
|
0
|
2
|
April 26, 2026
|
|
Exterior waterproofing on our 1962 Hamilton block foundation: $24,000 full perimeter project
|
|
0
|
0
|
April 26, 2026
|
|
Replaced all six bathroom exhaust fans in our Mississauga house: ESA permit, costs, and HRV notes
|
|
0
|
2
|
April 26, 2026
|
|
Solid vs engineered hardwood in our Burlington home: 3 years of humidity data and regrets
|
|
0
|
4
|
April 26, 2026
|
|
Installed a hot tub in our Oakville backyard: permits, electrical panel upgrade, full cost
|
|
0
|
2
|
April 26, 2026
|
|
Renovating our Toronto condo — what the board approved, what they didn't, full experience
|
|
0
|
2
|
April 26, 2026
|
|
Managing our whole-home renovation in Hamilton — GC vs self-managed, what we chose and lessons
|
|
0
|
1
|
April 26, 2026
|
|
Tuckpointed our 1920s Toronto semi chimney — mortar joint failure, full scope and cost
|
|
0
|
2
|
April 26, 2026
|
|
Roof replacement on our 1991 Whitby home — 27-year-old shingles, full process and cost
|
|
0
|
1
|
April 26, 2026
|
|
Full-height kitchen backsplash in our Oakville kitchen — porcelain to ceiling, full cost and install notes
|
|
0
|
2
|
April 26, 2026
|
|
Had to take our GC to small claims court in Ontario — the process, what worked, what we won
|
|
0
|
0
|
April 26, 2026
|
|
Switched our whole main floor to LVP — 12mm vs 8mm wear layer debate, what we found after 2 years
|
|
0
|
2
|
April 26, 2026
|
|
Renovated our freehold townhouse in Mississauga — what was different from a detached, lessons learned
|
|
0
|
2
|
April 26, 2026
|
|
Removed popcorn ceilings in our 1975 Scarborough home — asbestos testing, abatement, and skim cost
|
|
0
|
2
|
April 26, 2026
|
|
Balcony renovation on our North York condo unit — waterproofing failure discovered, full rebuild cost
|
|
0
|
1
|
April 26, 2026
|
|
Building a garden suite on our Toronto lot — 18-month process, costs, what we learned
|
|
0
|
2
|
April 26, 2026
|