|
WETT inspection horror story in Orangeville: what the inspector found and what it cost to fix
|
|
0
|
5
|
April 26, 2026
|
|
Upgraded all interior doors in our Oakville home to solid core: transformation photos and full cost
|
|
0
|
5
|
April 26, 2026
|
|
Learned the hard way which Toronto renovations need permits: a real list of my mistakes
|
|
0
|
8
|
April 26, 2026
|
|
Replaced our Mississauga kitchen countertops: quartz vs Dekton quotes, what we chose and why
|
|
0
|
7
|
April 26, 2026
|
|
Level 5 drywall finish in our Caledon master bedroom: what it looks like, what it cost
|
|
0
|
6
|
April 26, 2026
|
|
Our sump pump failed during spring melt in Markham: what happened, what we installed, and lessons
|
|
0
|
8
|
April 26, 2026
|
|
Rear addition on our Riverdale Toronto home: 280 sqft, heritage overlay, full permit timeline
|
|
0
|
7
|
April 26, 2026
|
|
HRV installation in our 1990 Brampton home after air sealing project: what changed and what didn't
|
|
0
|
8
|
April 26, 2026
|
|
Installed a 20kW Generac standby generator in Uxbridge: full permit process and winter performance
|
|
0
|
8
|
April 26, 2026
|
|
Exterior paint on our 1950s Leaside house: lead paint test result, prep process, and total cost
|
|
0
|
4
|
April 26, 2026
|
|
Built a garden suite on our Toronto east end lot: 18 months from permit to occupancy, real numbers
|
|
0
|
4
|
April 26, 2026
|
|
Renovated our laundry room in Newmarket: dryer duct was wrong, new tile, new plumbing
|
|
0
|
8
|
April 26, 2026
|
|
Aging-in-place renovation for my parents in Mississauga: roll-in shower, grab bars, and main floor bedroom
|
|
0
|
7
|
April 26, 2026
|
|
Converted our open fireplace to a direct-vent gas insert in Whitby: liner, permit, and what it actually heats
|
|
0
|
8
|
April 26, 2026
|
|
Interlock driveway installed in Pickering: 12-inch base, Unilock Beacon Hill, full cost and 2-year update
|
|
0
|
8
|
April 26, 2026
|
|
Cabinet refacing on our 1990s Etobicoke kitchen vs replacement: we got quotes for both
|
|
0
|
10
|
April 26, 2026
|
|
Burst pipe in our Ajax home during January freeze: what happened, what it cost, insurance outcome
|
|
0
|
5
|
April 26, 2026
|
|
Full roof replacement on our 2001 Whitchurch-Stouffville home: metal over old shingles, 18-month review
|
|
0
|
6
|
April 26, 2026
|
|
Epoxy floor in our Mississauga garage plus full basement concrete assessment: moisture testing results
|
|
0
|
5
|
April 26, 2026
|
|
Added skylights to our Toronto Victorian kitchen: tubular and conventional, what worked better
|
|
0
|
12
|
April 26, 2026
|
|
Replaced eavestroughs on our 1987 Oakville home: 4-inch to 5-inch and leaf guard decision
|
|
0
|
10
|
April 26, 2026
|
|
Re-tiled our entire main bathroom in Richmond Hill: Schluter system, large format tile, and full cost
|
|
0
|
2
|
April 26, 2026
|
|
Built a mudroom addition off our side entry in Burlington: permit, build, and design lessons
|
|
0
|
6
|
April 26, 2026
|
|
200-amp panel upgrade in our Vaughan home plus Level 2 EV charger: full ESA process
|
|
0
|
8
|
April 26, 2026
|
|
EIFS stucco rot on our 1997 Mississauga home: how bad it was and what the repair cost
|
|
0
|
4
|
April 26, 2026
|
|
Gas fireplace gave out after 22 years: repair vs replace decision and what we chose
|
|
0
|
7
|
April 26, 2026
|
|
Legalizing our basement apartment in Scarborough: fire separation, egress windows, permit timeline
|
|
0
|
7
|
April 26, 2026
|
|
Retaining wall replacement in our Scarborough backyard: engineered design, TRCA, and final cost
|
|
0
|
6
|
April 26, 2026
|
|
Spray foamed our rim joists and cathedral ceiling in Thornhill: R-values, costs, and thermal barrier requirement
|
|
0
|
6
|
April 26, 2026
|
|
Built a permit-pulled deck in Etobicoke: inspection process, footing depth, and what failed first time
|
|
0
|
9
|
April 26, 2026
|