Toronto West End Reno: Swansea Detached Full Main Floor Gut

Sharing our Swansea project — a full main floor renovation on a 1940s detached that had never been touched since original construction.

The house:
1,400 sq ft, 2.5 storey, original plaster walls, original oak floors under 3 layers of linoleum, original galley kitchen, single bathroom on 2nd floor.

What we did:

  • Removed galley kitchen wall (non-load bearing, confirmed by engineer)
  • New open kitchen: custom Shaker cabinets in sage green, Calacatta quartz, integrated appliances
  • Exposed and refinished original oak floors throughout main floor
  • Added powder room off new mudroom entry (rear entrance)
  • New mudroom built-ins at rear entrance
  • Full plaster repair and painting throughout

What we discovered:

  • Knob-and-tube in kitchen — had to partially rewire as part of the renovation
  • Lead paint under existing paint layers — managed with encapsulation in non-disturbed areas, proper abatement where we were cutting
  • Original oak floors were in excellent condition — refinishing only, no replacement needed

Cost breakdown:

Item Cost
Design $8,500
Kitchen cabinets and counters $24,000
Electrical (partial rewire + kitchen) $11,000
Plumbing (powder room add) $6,800
Floor refinishing $4,200
Mudroom built-ins $5,100
Painting + plaster repair $7,200
Permits $680
Misc $2,400
Total $69,880

Very happy with the result. The space feels completely transformed while keeping the character of the original house.

Has anyone else dealt with the K&T + lead paint combination in west-end Toronto? home.renovation.reviews