Open Concept Renovation in Toronto 2026: What's Involved in Removing a Wall

Opening up a closed floor plan is one of the most popular — and most misunderstood — renovations in the GTA. Here’s what it actually involves.

Step 1: Determine if the wall is load-bearing

This is non-negotiable. A load-bearing wall carries the weight of floors and roof structure above. Removing it without proper support causes structural failure. Signs a wall may be load-bearing: runs perpendicular to floor joists, located near the centre of the home, has walls directly above or below it in the same location.

Determination method: A structural engineer reviews your home plans and inspects the site. Cost: $1,500–$4,000 for structural assessment and stamped drawings. Required for permit.

Step 2: Engineering and permit

Structural engineer specifies the beam required to replace the wall’s load-bearing function. A permit is required for any structural wall removal in Ontario. Toronto permit processing: 15–25 business days.

Step 3: Temporary shoring

Before any wall removal begins, temporary supports (shoring) carry the load while the permanent beam is installed. This is critical and not a DIY step.

Step 4: Beam installation

The engineered beam (typically LVL — laminated veneer lumber — or steel) is installed in the header position. Temporary posts support it until permanent columns or posts are in place.

Step 5: Rough-in adjustments

Electrical, plumbing, or HVAC that ran through the removed wall must be rerouted. This adds cost (often $2,000–$8,000) and requires inspection.

Total cost for wall removal + beam: $8,000–$25,000+ depending on span, beam type, and what’s in the wall.

Has anyone done an open-concept conversion in Toronto recently? Share your experience — wall type, beam spec, permit timeline, and contractor.

home.renovation.reviews — Canada’s renovation community.