Ontario Electrical Renovation 2026: K&T, Aluminum Wiring, Panels, and ESA

Ontario Electrical 2026: What Your Home’s Wiring Era Means

Knob-and-Tube Wiring (Pre-1950)

Most Ontario insurers won’t insure homes with active K&T. No ground conductor. Open air wiring system.

Cost to replace: $12,000-$25,000 for a typical GTA home.

Required before any major renovation – you can’t insulate over K&T without creating a fire risk.

Aluminum Wiring (1960s-1970s)

Not inherently dangerous if properly managed. Problem: oxide layer at connections + expansion/contraction rate.

Solution 1 – Pigtailing: Connect aluminum runs to short copper pigtails at every device using approved connectors (Ideal 65 or AlumiConn). Cost: $3,000-$10,000. ESA-accepted.

Solution 2 – Full replacement: $8,000-$18,000. Complete peace of mind.

Panel Upgrades

Upgrade Cost
60A → 100A $1,500-$2,500
100A → 200A $2,500-$4,500
200A → 400A $4,500-$8,000

200A recommended before adding EV charger or cold-climate heat pump.

All panel work requires ESA permit + inspection in Ontario.

EV Charger Rough-In

Level 2 (240V, 40-50A dedicated circuit): $800-$1,800 installed.
Do this during renovation – costs 3-4x more after walls close.

AFCI/GFCI Requirements (Current OBC)

  • GFCI: within 1.5m of any water source
  • AFCI: bedrooms (and expanding with each code update)