Ontario Building Permit Process 2026: Step-by-Step for Homeowners

Ontario Permit Process 2026: What Homeowners Need to Know

Step 1: Does Your Project Require a Permit?

YES – permit required:

  • Structural changes (load-bearing walls, beams)
  • New plumbing rough-ins
  • Electrical panel upgrades
  • Basement finishing (new habitable space)
  • Decks over 24 inches above grade
  • Any addition
  • Garden/laneway suites

NO – typically no permit:

  • Painting
  • Flooring
  • Cabinet replacement (no plumbing move)
  • Fixture swaps at same location

When uncertain: call your municipality’s building department. They will tell you.

Step 2: Prepare Application

Required documents (varies by scope):

  • Site plan (property lines, existing structures, proposed work)
  • Floor plans (existing + proposed)
  • Elevation drawings (additions or exterior changes)
  • Structural drawings (P.Eng or OAA stamp for complex work)
  • Specification notes

Application fee: $200-$3,500 depending on municipality and scope.

Step 3: Wait for Approval

Municipality Simple Complex
Toronto 3-8 weeks 10-20 weeks
Mississauga 2-6 weeks 6-14 weeks
Brampton 3-7 weeks 8-16 weeks
Markham/Vaughan 2-5 weeks 6-12 weeks

Step 4: Pass Required Inspections

Common stages: footing, framing/rough-in, insulation, final.
Book 2-5 business days in advance.

Never start construction before permit approval. Stop-work orders = expensive.