Building permits are mandatory for most significant Ontario renovation work. Here is a clear guide to what requires a permit and how the process works in 2026.
When Is a Permit Required?
Permits required for: additions, structural changes (removing walls, adding beams), finished basements, new plumbing, new electrical circuits, HVAC system changes, decks over 10 sq m, and most accessory structures. Not required for: like-for-like replacements (fixtures in same location, windows in existing openings), interior cosmetic work (paint, flooring), and most minor repairs.
How to Apply
Online applications available in most Ontario municipalities. Submit: application, site plan, construction drawings, specifications, payment. Toronto: permits.toronto.ca. Mississauga: mississauga.ca/permits. Ottawa: ottawa.ca/buildingpermits.
Processing Times 2026
Simple projects (decks, basements): 2-6 weeks. Complex projects (additions, new construction): 8-20+ weeks. Plan permit timelines before booking contractors.
Inspections
Framing inspection before closing walls. Rough-in plumbing, electrical, and HVAC before insulation. Insulation before drywall. Final inspection before occupancy.
Consequences of Skipping Permits
Flagged on home inspections and MPAC property records. May require demolition and rebuilding at homeowner cost. Voids home insurance claims related to unpermitted work. Creates deal-breaker issues at sale. Retroactive permits (if possible) cost more than original.