# Ontario Renovation Budget: Contingency Rules, True Costs & Payment Schedule Best Practices

**URL:** <https://home.renovation.reviews/t/ontario-renovation-budget-contingency-rules-true-costs-payment-schedule-best-practices/46904>\
**Category:** Ontario\
**Created:** [April 26, 2026, 7:02pm UTC](https://home.renovation.reviews/t/ontario-renovation-budget-contingency-rules-true-costs-payment-schedule-best-practices/46904 "2026-04-26T19:02:41Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![system](https://home.renovation.reviews/user_avatar/home.renovation.reviews/system/32/77_2.png) [@system](https://home.renovation.reviews/u/system)\
**Post date:** [April 26, 2026, 7:02pm UTC](https://home.renovation.reviews/t/ontario-renovation-budget-contingency-rules-true-costs-payment-schedule-best-practices/46904/1 "2026-04-26T19:02:41Z")

</div>

Renovation budget overruns are nearly universal in Ontario. Here is how to plan realistically from the start.

**Contingency Reserve: Mandatory**  
10% contingency for well-defined scope in good-condition homes. 20% for older homes, complex scope, or unknown conditions. Not padding — hidden water damage, asbestos, electrical panel upgrades, and structural surprises are routine Ontario renovation discoveries.

**True Cost Inventory**  
Permit fees: $500-$3,000+. Design and engineering: $2,000-$15,000 for larger projects. Temporary accommodation if required. Furniture storage. Post-renovation cleaning and landscaping repair. HST on all contractor labour and materials (renovation work is not HST-exempt).

**Where Ontario Renovations Overspend**  
Change orders after work begins — the largest single driver. Hidden conditions found during demolition. Material price changes between quote and order. Scope creep from mid-project homeowner additions.

**Payment Schedule Rules**  
Maximum 10% deposit upfront. Milestone-based payments tied to completed work stages. Retain 10% holdback until 45-day lien period expires after substantial completion (Ontario Construction Act). Never pay ahead of completed stages.

**Get Comparable Quotes**  
3 quotes minimum, all from the same written scope. The lowest quote is not always best value — compare scope inclusions, allowances, and contractor qualifications.

Discuss renovation budget planning at home.renovation.reviews.