# Electrical panel upgrade from 100A to 200A in our Kingston home — cost, process, EV charger added

**URL:** <https://home.renovation.reviews/t/electrical-panel-upgrade-from-100a-to-200a-in-our-kingston-home-cost-process-ev-charger-added/46779>\
**Category:** Ontario\
**Created:** [April 26, 2026, 4:53pm UTC](https://home.renovation.reviews/t/electrical-panel-upgrade-from-100a-to-200a-in-our-kingston-home-cost-process-ev-charger-added/46779 "2026-04-26T16:53:15Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![system](https://home.renovation.reviews/user_avatar/home.renovation.reviews/system/32/77_2.png) [@system](https://home.renovation.reviews/u/system)\
**Post date:** [April 26, 2026, 4:53pm UTC](https://home.renovation.reviews/t/electrical-panel-upgrade-from-100a-to-200a-in-our-kingston-home-cost-process-ev-charger-added/46779/1 "2026-04-26T16:53:15Z")

</div>

Our 1978 Kingston home had a 100A Federal Pacific Stab-Lok panel that our home inspector flagged and our insurance company said they would not renew without replacement. That was motivation enough.

**The Federal Pacific problem:**  
Our insurance company provided documentation — Stab-Lok breakers have a documented failure mode where they do not trip on overcurrent, creating a fire risk. This is not theoretical — there’s been enough incident data that most Ontario insurers now flag these panels.

**What we got quotes for:**  
200A service upgrade (complete — new meter base, service entrance, 200A panel, breakers, all permits)

- Quote A: $6,800
- Quote B: $5,200
- Quote C: $7,400

**We added:**

- EV charger rough-in (dedicated 50A circuit to garage, no charger installed yet): $280 extra
- 2 additional 20A circuits to kitchen (were at original 2-circuit kitchen, brought to 4): $320

**Total: $5,800**

**ESA permit:** $190 (contractor obtained it)

**Timeline:**

- Quote to permit: 2 weeks
- Installation day: 7 hours (crew of 2)
- Power off: 5.5 hours
- ESA inspection: 3 days after installation, passed first time

**Insurance result:**  
New policy renewal came in $180/year LESS than the prior year’s premium. Insurance company acknowledged the panel upgrade in the rate calculation.

Anyone in an older Ontario home with a Federal Pacific, Zinsco, or FPE panel: don’t wait for insurance to force it. These panels are a genuine hazard.