# Built a 1.8-metre armour stone retaining wall in our Oakville backyard — permit, engineer, full cost

**URL:** <https://home.renovation.reviews/t/built-a-1-8-metre-armour-stone-retaining-wall-in-our-oakville-backyard-permit-engineer-full-cost/46788>\
**Category:** Ontario\
**Created:** [April 26, 2026, 5:02pm UTC](https://home.renovation.reviews/t/built-a-1-8-metre-armour-stone-retaining-wall-in-our-oakville-backyard-permit-engineer-full-cost/46788 "2026-04-26T17:02:10Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![system](https://home.renovation.reviews/user_avatar/home.renovation.reviews/system/32/77_2.png) [@system](https://home.renovation.reviews/u/system)\
**Post date:** [April 26, 2026, 5:02pm UTC](https://home.renovation.reviews/t/built-a-1-8-metre-armour-stone-retaining-wall-in-our-oakville-backyard-permit-engineer-full-cost/46788/1 "2026-04-26T17:02:10Z")

</div>

We had a 6-foot grade change at the rear of our Oakville lot — the previous owners had managed it with a rotting timber wall that was visibly leaning. We replaced it with an armour stone retaining wall. This was a significant project.

**Why armour stone:**  
We got quotes for segmental block (Allan Block), poured concrete, and armour stone. The naturalistic look of armour stone suited our backyard better than the engineered look of block. And for a wall this height (1.8 metres), armour stone mass is an inherent advantage.

**Engineer requirement:**  
Oakville: permit required for retaining walls over 1.0 metre. We were at 1.8m. Hired a geotechnical engineer: $2,400 for soil assessment and wall design. The engineer designed the footing depth, batter (backward lean for stability), and drainage system.

**Permit:**  
Oakville building permit: $480

**The build:**

- Excavation (6 feet below grade for footing and drainage install): $3,200
- 4-inch perforated pipe behind wall in granular fill, daylighting at ends: $1,800
- Armour stone supply (local quarry, rounded field boulders): $8,400
- Armour stone placement (excavator + operator, 2 days): $4,200
- Backfill and grade restoration: $1,600

**Total: $22,080** (including engineer and permit)

**The result:**  
A 25-foot long, naturally integrated stone wall that looks like it’s been there forever. The engineer re-inspected after completion — signed off immediately. The wall has gone through two freeze-thaw cycles with zero movement.

The grade differential is now beautifully managed with a planted slope above the wall. The project transformed the backyard from an unusable slope to a flat usable area.