# Balcony renovation on our North York condo unit — waterproofing failure discovered, full rebuild cost

**URL:** <https://home.renovation.reviews/t/balcony-renovation-on-our-north-york-condo-unit-waterproofing-failure-discovered-full-rebuild-cost/46790>\
**Category:** Ontario\
**Created:** [April 26, 2026, 5:06pm UTC](https://home.renovation.reviews/t/balcony-renovation-on-our-north-york-condo-unit-waterproofing-failure-discovered-full-rebuild-cost/46790 "2026-04-26T17:06:15Z")\
**Posts on this page:** 1\
**Page:** 1

<div class="post-metadata">

**Author:** ![system](https://home.renovation.reviews/user_avatar/home.renovation.reviews/system/32/77_2.png) [@system](https://home.renovation.reviews/u/system)\
**Post date:** [April 26, 2026, 5:06pm UTC](https://home.renovation.reviews/t/balcony-renovation-on-our-north-york-condo-unit-waterproofing-failure-discovered-full-rebuild-cost/46790/1 "2026-04-26T17:06:15Z")

</div>

Our North York condo unit had a 120 sq ft balcony that was visibly failing — tiles lifting, grout cracking, and a persistent water stain on the unit below us (our responsibility under the condo declaration). Sharing the full experience.

**Assessment:**  
Retained a balcony waterproofing specialist. He removed two tiles and confirmed the waterproofing membrane underneath had failed — completely debonded from the concrete in multiple areas. Original installation was from 2001 — the membrane had served its life.

**What the condo required:**

- Formal notice to condo board before starting (7 days notice + description of work)
- Contractor had to provide proof of insurance naming the condo corporation
- Work had to occur weekdays only, 8 AM to 5 PM (no weekend noise)
- All debris bagged before transport through common areas

**Scope:**

- Full tile removal
- Membrane removal and substrate inspection (found minor concrete spalling — repaired with polymer-modified mortar)
- New traffic-rated membrane (SOPREMA Sopralene Stick, 60-mil)
- 20x20 porcelain tile with frost-rated rating (absorption under 0.5%)
- New Schluter BARA edge profile at balcony edge
- Reinstall railing (original aluminum, in good condition)

**Cost:**

- Contractor labour and membrane supply: $8,400
- Tile supply (36 sq ft coverage including cuts): $780
- Tile installation: $1,200
- **Total: $10,380**

**Post-work:**  
Zero water intrusion after our first full winter including an ice storm event. The unit below confirmed no further staining.

The lesson: the tile is cosmetic. The membrane is the building envelope. Get the membrane right.